Projects
-
PRP-III, Supply of Saturation & Air Diving Services
Project Name: PRP-III, Supply of Saturation & Air Diving Services Client Name: SEAMEC LTD Vessel Name: Seamec 3 Operator Name: ONGC Project Description: Residual work of PRP-3, Additional Pipeline Project and HRD-Pipeline Project. IGOPL Scope: Crossing and free span correction, Riser and Clamp Installation, Riser Removal Duration: TBA Location: Mumbai High -
MB Platform and Pipeline project
Project Name: MB Platform and Pipeline project Client Name: LTSOPL Vessel Name: LTS-3000 Operator Name: BG India. Project Description: Installation of MB Platform and interconnecting pipeline segments. IGOPL Scope: Stinger Check,Diving intervention during jacket installation,Tie-in spools Duration: TBA Location: Mumbai High -
MB Platform and Pipeline project
Project Name: MB Platform and Pipeline project Client Name: LTSOPL Vessel Name: DP DSV Seamec 3 Operator Name: BG India. Project Description: Installation of MB Platform and interconnecting pipeline segments. IGOPL Scope: Riser and Clamp Installation, Bow-string Installation, Pipeline removal. Duration: 29-Oct-2014 to - Location: Mumbai High -
Cluster-7 FPSO
Project Name: Cluster-7 FPSO Client Name: Bumi Armada Vessel Name: FPSO/Armada Hawk Operator Name: ONGC IGOPL Scope: Air Diving support on FPSO,Air & SAT diving support on Armada Hawk,Hookup and assistance during commissioning of the FPSO. Duration: TBA Location: Mumbai High -
MB Platform and Pipeline project, Supply of Diving Services for Pre-Engineering
Project Name: MB Platform and Pipeline project, Supply of Diving Services for Pre-Engineering Client Name: LTSOPL Vessel Name: DP Vessel RAMAYA Operator Name: BG India. IGOPL Scope: Pre-Engineering Survey at PPA Platform,Pre-Engineering Survey at PE Platform, Pre-Engineering Survey at PF Platform Duration: 12-Apr-2014 to 26-Apr-2014 Location: Mumbai High -
PRP-III, Heera Pipelines & Additional Pipelines Projects, Supply of Saturation & Air Diving Services
Project Name: PRP-III, Heera Pipelines & Additional Pipelines Projects, Supply of Saturation & Air Diving Services Client Name: Leighton (LWIN) Vessel Name: DP2 DSV Crest Odyssey 2 Operator Name: ONGC Project Description: Over all 55 Segments (rigid+flexi) and 350 Km laying. IGOPL Scope: Provision of Saturation & Air Diving services for:Crossing and free span correction, Riser and Clamp Installation. Duration: 25-Jan-2014 to 11-May-2014 Location: Mumbai High -
PRP-III, Heera Pipelines & Additional Pipelines Projects, Supply of Saturation & Air Diving Services
Project Name: PRP-III, Heera Pipelines & Additional Pipelines Projects, Supply of Saturation & Air Diving Services Client Name: SEAMEC LTD Vessel Name: Seamec 3 Operator Name: ONGC Project Description: Over all 55 Segments (rigid+flexi) and 350 Km laying. IGOPL Scope: Provision of Saturation & Air Diving services for:Crossing and free span correction,Riser and Clamp Installation. Duration: 25-Dec-2013 to 15-May-2014 Location: Mumbai High -
D1 FPSO, Supply of Air Diving Services on board FPSO
Project Name: D1 FPSO, Supply of Air Diving Services on board FPSO Client Name: Bumi Armada Vessel Name: Armada Sterling/Armada Hawk Operator Name: ONGC Project Description: IGOPL Scope: Provision of Saturation & Air Diving services for,Turret Installation, Miscellaneous works Duration: 10-Dec-2012 to 10-Apr-2013 Location: Mumbai High -
Zawtika Development Project, Phase 1A EPCIC, Supply of Air Diving Services
Project Name: Zawtika Development Project, Phase 1A EPCIC, Supply of Air Diving Services Client Name: L&T Vessel Name: LTS-3000 Operator Name: PTTEP International Limited Project Description: 31 Segments x 198 Kms over two working seasons. IGOPL Scope: Pipe Laying,Platform Installation Duration: 01-Nov-2012 to 04-Apr-2013 Location: Myanmar -
PRP-III, Supply of Saturation & Air Diving Services.
Project Name: PRP-III, Supply of Saturation & Air Diving Services. Client Name: SEAMEC LTD Vessel Name: Seamec 3 Operator Name: ONGC Project Description: 31 Segments x 198 Kms over two working seasons. IGOPL Scope: Provision of Saturation & Air Diving services for:Crossing and free span correction, Riser and Clamp Installation. Duration: 04-Oct-2013 to 30-may-2014 Location: Mumbai High -
Supply of Air Diving System+2 Techs.
Project Name: Supply of Air Diving System+2 Techs. Client Name: SARKU / T L Offshore Vessel Name: LTS-3000 Operator Name: ExxonMobil Exploration and Production Malaysia Inc. ("EMEPMI") Project Description: IGOPL Scope: Supply of Air Diving system, Supply of 2 X Dive Techs for system Maintainance Duration: 08-Jun-2012 to 07-Oct-2012 Location: Malaysia -
Supply of Air Diving System+2 Techs.
Project Name: Supply of Air Diving System+2 Techs. Client Name: SARKU / T L Offshore Vessel Name: LTS-3000 Operator Name: ExxonMobil Exploration and Production Malaysia Inc. ("EMEPMI") Project Description: IGOPL Scope: Supply of Air Diving system, Supply of 2 X Dive Techs for system Maintainance Duration: 08-Jun-2012 to 07-Oct-2012 Location: Malaysia -
SKO Pipe Line Project.
Project Name: SKO Pipe Line Project. Client Name: SARKU / T L Offshore Vessel Name: NorCEEndeovour Operator Name: PETRONAS Carigali Sdn Bhd (PCSB) Project Description: IGOPL Scope: Pipeline Installation: 10"x 4km Tapis-A to Tapis-C (GI) , Submarine Cable Laying: Tapis-A to Tapis-C Duration: 20-Apr-2012 to 07-jun-2012 Location: Malaysia -
BM-B & CK-D WELLHEAD PLATFORM OFFSHORE INSTALLATION.
Project Name: BM-B & CK-D WELLHEAD PLATFORM OFFSHORE INSTALLATION. Client Name: SARKU / T L Offshore Vessel Name: LTS-3000 Operator Name: CARIGALI HESS Project Description: IGOPL Scope: pipeline (SS316L), 3.9km from CKD to CKC. Duration: 20-Apr-2012 to 07-jun-2012 Location: Malaysia-Thai Joint Development Area -
BCP Balai ClusterMonopod Installation Project.
Project Name: BCP Balai ClusterMonopod Installation Project. Client Name: SARKU / T L Offshore Vessel Name: NorCEEndeovour Operator Name: BC Petroleum Sdn, Bhd (BCP) Project Description: IGOPL Scope: Installation of Sleeve Stop/Clamp- 1 nos. for each structure,Installation of Termination Pad-eyes- 1 nos, for each structure, Installation of 3.5” dia. GUY WIRE Cable- 6 nos, for each structures (Termination pad-eye end), Tensioning of GUY WIRE Cable Duration: 08-Jan-2012 to 13-Sep-2012 Location: Malaysia -
RS 12 Project
Project Name: RS 12 Project Client Name: NPCC/ Seamec Ltd. Vessel Name: DP DSV Seamec Princess Operator Name: OGGC Project Description: IGOPL Scope: Installation of SSIV & SUTU V/V at B-2 Jacket,Jacket face survey for member integrity at RS-12Jacket,a) B-46 Jacket,b) B-48 Jacket. Duration: 21-Mar-2012 to 07-Apr-2012 Location: Mumbai High -
B46 Pipelines & Platform Modification
Project Name: B46 Pipelines & Platform Modification Client Name: KSS Engineering LTD. Vessel Name: DP DSV Seamec-III Operator Name: OGGC Project Description: IGOPL Scope: Crossing & Free Span Correction, Grouting Duration: 25-Jan-2012 to 28-May-2012 Location: Mumbai High -
Transportation & Installation of Offshore Facilities for Yetagun-C Jacket. (Water Depth: 104.2 m)
Project Name: Transportation & Installation of Offshore Facilities for Yetagun-C Jacket. (Water Depth: 104.2 m) Client Name: T L Offshore Vessel Name: LTS-3000 Operator Name: PCML Project Description: IGOPL Scope: Removal of Upending Rigging Platform, Installation of Boat Landing, Barge Bumper,Removal of Venting, Flooding & Grouting Apparatus Duration: 11-Oct-2011 to 5- Dec-2011 Location: Myanmar -
L&T-MHN Redevelopment Phase II / MHN Process Platform & Living Quarters Project
Project Name: L&T-MHN Redevelopment Phase II / MHN Process Platform & Living Quarters Project Client Name: Mc Dermott Vessel Name: DLB101/AOS104 Operator Name: ONGC Project Description: Process Platform (4/8 legged) – MNP
220 persons Living Quarter (4 legged ) – MLQ
Tripod type platform for flare – MF-Flare
Modification at MNW and NA Platforms.
IGOPL Scope: Supply of Grouting Equipment for Jacket Annulus grouting,Supply of Grout Material: 255 MT Duration: 19- Sep-2011 to 6-Feb-2012 Location: Mumbai High -
HEERA REDEVELOPMENT PROJECT PHASE II
Project Name: HEERA REDEVELOPMENT PROJECT PHASE II Client Name: Punj Lloyd Ltd. Vessel Name: DP DSV Seamec-II Operator Name: ONGC Project Description: Laying of 141.0 Km Rigid P/Ls in 25 segments + Flexible P/Ls x 14 Kms in 3 segments for well fluid, Gas lift and Water injection Pipelines IGOPL Scope: B134A-12" Riser, West Face,HI-6" Riser South Face,10" Riser South Face,12" Riser, West Face,14" Riser, West Face,HJ-6" Riser, West Face,12" Riser, West Face,HSC-8" Riser South Face,16" Riser, West Face. Duration: 24-May-2011 to 30-May-2011 Location: HEERA Field -
B22 / RS 12 Project
Project Name: B22 / RS 12 Project Client Name: NPCC/ Seamec Ltd. Vessel Name: DP DSV Seamec Princess Operator Name: ONGC Project Description: IGOPL Scope: Crossing and free span correction, Jacket inspection and Removal of Installation aids. Duration: Mar-2011 to May-2011 Location: Mumbai High -
MHNRD-II Pipelines Project
Project Name: MHNRD-II Pipelines Project Client Name: SWIBER Vessel Name: DP DSV Swiber Atlantis Operator Name: ONGC Project Description: Laying of 141.0 Km Rigid P/Ls in 25 segments + Flexible P/Ls x 14 Kms in 3 segments for well fluid, Gas lift and Water injection Pipelines IGOPL Scope: Free Span Correction, Grouting Duration: Feb-2011 to Jun-2011 Location: Mumbai High -
MHN Process Complex & MHNRD Well Platform
Project Name: MHN Process Complex & MHNRD Well Platform Client Name: L&T/LTSOPL Vessel Name: DP DSV Seamec-II Operator Name: ONGC Project Description: Process Platform (4/8 legged) – MNP
220 persons Living Quarter (4 legged ) – MLQ
Tripod type platform for flare – MF-Flare
Modification at MNW and NA Platforms.IGOPL Scope: Sea Bed Survey, Pre/Post Jacket Launching, Cutting of Buoyancy Tank, Turn-on, Grout Lines, Post Installation Survey and Anode counting, Pressure Grouting on MNF-1, Conventional grouting on MLQ & MNP, Installation of Boat Landing, Barge Bumper etc. Duration: Nov-2010 to May-2011 Location: Mumbai High -
MHN Process Complex & MHNRD Well Platform
Project Name: MHN Process Complex & MHNRD Well Platform Client Name: L&T/LTSOPL Vessel Name: Barge LTS-3000 Operator Name: ONGC Project Description: Process Platform (4/8 legged) – MNP
220 persons Living Quarter (4 legged ) – MLQ
Tripod type platform for flare – MF-Flare
Modification at MNW and NA Platforms.IGOPL Scope: Sea Bed Survey, Pre/Post Jacket Launching,Cutting of Buoyancy Tank, Trunnion, Grout Lines,Post Installation Survey and Anode counting. Duration: Nov-2010 to May-2011 Location: Mumbai High